Control Corporation

Services

Home – Services

System 9 A Coating Test

Under Regulation O-201

Anchor Profile Measurement

Alignment of pipes and connections.

Thickness Measurement Epoxy coating.

Thickness Measurement Finish

Manufacturing of Product Pipes

(Applicable Standards) API, ASME ASTM

Cutting and beveling of pipes.

Alignment of pipes and connections

Welding at Joints

Application of coating

Installation of Product Lines

On an offshore platform

Removal of pipes and valves.

Lifting and Installation of spools and valves.

Installation of Gaskets

Line Standardization and Torque Application

General Maintenance

Electric motors

Removing the engine and pump

Complete disassembly

Assembly of the unit

Engine and Pump Installation

General Maintenance

To electrical substations

Inspection and Disassembly of Cells

Preventive Maintenance on Cells

Cell Assembly

Electrical Tests

Overhaul of Marine Loading Arms

FMC. (1)

Removal of the loading arm

Disassembly and inspection

Application of Sandblasting

Application of coating

Overhaul of Marine Loading Arms

FMC. (2)

Swivel joint assembly.

Hydraulic System Assembly

System Assembly Automation

Installation of the Loading Arm

Comprehensive Wellhead Repair

(1)

Disassembly and Inspection of Components

Specialized assessment.

Grinding and material addition

Replacing Brake Pads

Comprehensive Wellhead Repair

(2)

Initial condition of protectors

Initial condition of drive pulleys

Brake Turbine Repair

Reconditioning of Engine Bases

Comprehensive Wellhead Repair

(3)

Application of filler material during welding

Specialized Welding Application

Assembly Process

Tolerance Measurement

Comprehensive Wellhead Repair

(4)

Application of coating to pulley

Applying coating to protectors

Head Assembly

Packaging and Shipping

Lifting Experts

Cargo

Lifting a load with a 220-metric-ton crane

Lifting a load with two cranes

Lifting a load with Pickman arms

Guaranteed cargo lifts

Systems Experts

Hydraulics

Installation of the motor and pump in the hydraulic unit

Installation of the storage unit

Replacing a solenoid valve

Installation of a Hydraulic Actuator

System Experts

Automation

Installation of proximity sensors

Latch Tests on a Logic Controller

Wiring Connection for Solenoids

Connection for automation of loading arm

Experts in Supply and Installation

Fluid Measurement Equipment

Installation of power supply for meter

Latch Tests on a Logic Controller

Installation of a non-intrusive flow meter in a multi-product pipeline carrying gasoline, LPG, diesel, and Jet A1

Advanced Monitoring System. Reliable Solutions for Industry

Write to Us Today

& Give Your Project a Boost

We are ready to assist you with top-tier technical solutions. Our multidisciplinary team will provide the immediate response your infrastructure requires.

📞 Customer Service Channels

Office Phone 0424-2526047
Alternate Number 0412-0924338

📍 Strategic Locations

- Administrative Headquarters: Aldonza Manrique Ave., Provemed Business Center, Level 2, Office 43. Playa El Ángel Development, Pampatar, Nueva Esparta State.
- Operational Headquarters (Industrial Base): Juan Bautista Arismendi Ave., Agua Paloma Sector, specifically in the Las Giles Sector, Tubores Municipality, Nueva Esparta State.

📧 Email

Info@corpocontrol.com
Sales@corpocontrol.com

Reliable Engineering Solutions Now

Request Your Technical Consultation Today

Contact us!

0295-262.59.34